Currently, 90% of panel companies on the market use an installation method that involves first installing corrugated iron sheets and then fixing them with 5cm thick C-shaped steel with rivets. However, this method has a high probability of not being accurate or not biting the point, single-point fixing, gradually loosening due to wind, and the probability of 40% being blown away by typhoons.